Hanging
around Fort Pierce
Well
– maybe not “hanging” but perched.
We
were hauled out on schedule just after 8 AM on Monday – seven days ago and in
the meantime we have been sitting in the yard alternately waiting for parts and
uninstalling/installing the offending parts. A few mysteries have been sorted
out over the course of the week as well and the galley slave managed to get a
little holiday baking accomplished. Over
the course of the summer Steve has been chasing a slow incursion of water – and
has been systematically troubleshooting the possible options. Arch helped him remove the washer/dryer to
check the port side stabilizer – the one that forcefully encountered the
submerged log in the Erie Canal. Seeing
no evidence of water there, he moved on to other options – we may have
mentioned our weeks of colorfully tinted water to determine if the water tanks
were leaking? After disassembling the stabilizers to install the new seals
which were scheduled for routine maintenance, the boys clearly saw that the log
did indeed do serious damage to our port stabilizer innards. On first blush it
was only the shaft and a few minor connectors, but on a second and closer look
there were cracks in the housing – a hefty piece glued into the hull with
nearly permanent 5200. Needless to say, the uninstall was a lengthy, sweaty and
noisy process – Frank was left undisturbed, but sweet Annie (who has yet to
hiss at the ace KK fix-it man) could not help mentioning she was not happy. The
good news, it does appear that those cracks were the source of our extra water…..
Life
on the hard in this working boatyard has been a change from our floating
normal. Both cats wander outside and stare out the open transom door – we are
not sure if they realize that there is no water out there. (But then we have
never been sure they realize the boat is mostly on the water!) It is a tall ladder climb to reach the gravel,
our bikes and the local facilities. Fortunately the cats have not shown any
interest in trying the ladder although they both do their daily circuit of the
outside decks per normal.
This
busy yard is constantly full of contractors and owners working on their boats. Most start after 8 AM and finish about 5ish
or when it is completely dark. Boats are lifted out of the water and returned
with the 75ton lift that the operator runs remotely. Sanders and buffers,
country music on several radios and the more than occasional train, add to the
atmosphere. Steve has soldiered on
sanding, priming and painting a couple coats on our hull when he has not been
bashing away at the cracked stabilizer.
We
have been eating well since there is a handy Publix a short bike ride away and
by extending our stay we were able to shop the award winning Farmer’s Market on
the weekend. The very unpretentious Buoy 12A restaurant proved to offer meals
that exceeded their glowing reviews. And, in case all the smells from the galley
cookie factory did not get us in the holiday mood, the local boat parade party
added some seasonal festivities. The Cracker Boy Boatyard is located on Taylor
Creek which offers a premier vantage point for the parade of boats with their
festive lights and special effects. So the residents and staff host a party on
their wharf and kindly included us.
When
all the stars align and the new parts arrive and are firmly “fixed” in their
respective spots, we will be re-floated and finally – if belatedly – head on south.
When is the big question – but until then we remain at home on Erben Renewal.
No comments:
Post a Comment